MANILA, Philippines — The government is eyeing the filing of charges against the Discayas over poor structural design and unfinished work of the Philippine Film Heritage Building (PFHB) in Intramuros, Manila, Malacañang said Thursday.
Palace Press Officer Claire Castro discovered the sloppy construction of the film center during her inspection of the PFHB that was supposed to be completed Sept. 4, 2025.
Castro said the PFHB was built by the Discaya-owned Great Pacific Builders and General Contractor Inc.
Govt eyes charges vs Discayas over 'unfinished' PH Film Heritage Building
"This building should be turned over now because that it's supposedly finished, Sept. 4, 2025. We can see now how it's built and why it's disappointing," Castro told reporters after inspecting the film center., This news data comes from:http://erlvyiwan.com

"And this building, its contractor is Great Pacific Builders and General Contractor Inc. This is one of the corporations of the Discayas," she added.
- Floods kill over 30 in Indian-controlled Kashmir, displace 150,000 in east Pakistan
- Taylor Swift, Travis Kelce engaged
- Modi: India, Japan to 'shape the Asian century'
- MMDA prepares for PH hosting of FIVB
- President pushes probe on flood control mess amid congressional inquiry
- House panel defers 2026 DPWH budget until agency submits changes
- Argentina hunts Nazi-looted painting revealed in property ad
- Marcos mum on Magalong joining independent commission for DPWH probe
- MMDA readies for FIVB men’s volleyball
- Comelec to resume BARMM polls ballot printing Thursday